- October 1, 2007: Phase 1 report due
- Specification Matrix
- Gantt Chart
- October 24, 2007: Deadline to pick final design
- We need to pick one of the three desings by this day.
- Note: we can try to merge all three together if desired
- There is still a possibility that the picked design may change
- October 29, 2007: Phase 2 report due
- Conceptual Drawings of three concepts
- Preliminary Manufacturing considerations and costs
- Conceptual Design Calculations
- Design Evaluation Matrix
- December 5, 2007: Phase 3 report due
- Design Compliance Matrix
- Detailed Design Calculations
- Detailed design drawings
- January 7-11, 2008: Pre-CDR with MecE department
- Preview drawing package to Curt
- Discuss what needs more work and receive feedback
- January 21-25, 2008: CDR with MecE department
- Final review of mechanical platform
- Release of funds and machine shop time upon completion.